DS03 shutdown 18.9.2024/ Mechanical activities with CPECC:
1-Attending and witnessing with CPECC team daily to check flange management and joint integrity of flanges that are required to be tied onsite.
2-Ispection of new gaskets, stud bolts, and flanges before shutdown and during shutdown.
3- Witnessing for piping cleanliness and blowing activities of piping, then sign off related docs with subcontractor.
4-Walkdowns on completed subsystems that contain (piping, valves ....etc.) and getting punch items